Biological wastewater treatmentBiological WWTP are usually considered as a “heart” of wastewater treatment process scheme. Treated wastewater quality depends a lot on effective operation of biological WWTPs Operation of the most of sewerage treatment plants is connected with the following difficulties and problems:
Ecopolymer Group can offer complete solution of the problems, emerged at WWTPs. To achieve the required results all works and activities can be accomplished within the following stages:
Determination of inadequate WWTP operation causesThe following steps are carried out within this kind of works:
Process design for biological treatment plants reconstruction Within the development of existing biological WWTP reconstruction technology maximal utilization of the existing capacity plants forms the basis of the technology. Due to that capital reconstruction expenditures are being reduced. Ecopolymer Group specialists apply to the advanced world experience in the area of wastewater treatment. Based on the ASM2d international mathematical models and EAWAG bioP module it has been developed EcoSim, the original computer program, which allows to calculate the main indexes of treated water based on initial data regarding wastewater composition, architecture, characteristic, describing investigated treatment scheme. Based on the obtained calculations optimal manufacturing scheme is developed using the existing capacity plants. If necessary step-by-step reconstruction plan and investment ground are also developed. Replacement of aeration systemInstallation of high-performance tubular diffusers. These diffusers are designed for operation within different conditions and allow 20-30% power consumption reduction. Aqua-Pro-M diffusers Aqua-Line-M diffusers Installation of heigh-performance disc diffusers. Aqua-Plast diffusers Aqua-Tor diffusers Reconstruction of clarifiersWe offer durable corrosion-resistant equipment and materials for secondary clarifiers reconstruction. Equipment:
Application of above-mentioned materials allows to normalize and intensify the operation of secondary clarifiers:
Replacement of air-blowing equipment Air-blowing equipment is one of the main power consumers at biological WWTPs. Application of the equipment with 40-100% control range allows to reduce power consumption, especially within minimal inflow hours. Air flow-rate control is manufacturing process is We accomplish an optimal selection of modern air-blowing equipment with wide control range. Removal of biogenic compounds Arrangement of denitrification and phosphorus compounds removal systems:
The following devices might be installed in mixing zones: In case of weak wastewater treatment one of the ways of phosphorous biological removal process effective execution is reconstruction of primary clarifiers for phosphorous removal basins: Residual phosphorous chemical removal (in case of necessity): Determination of inlet point, types and dosage of reagents. Wastewater aftertreatment Carrying-out of construction and reconstruction of wastewater aftertreatment units applying the following elements: Filters with granular bed and high-performance drains; Bioreactors with attached microflora and ECOPOLYMER units. Process setup of biological WWTPsProcess setup marks the final stage of biological WWTP reconstruction. ECOPOLYMER carries out the following:
Result: provision of biological WWTPs stable operation and waste disposal standards achievement. Suppression of filamentous sludge swellingWe carry-out the following works upon activated sludge swelling:
|