Ecopolymer group

Inside pumping stations

The main design solutions
  • calculation and matching of modern pumping devices, pipeline systems, managing and control devices in order to achieve electric power costs’ reduction;
  • modern equipment application;
  • changing of technically worn pumping equipment with maximal application of existing machine halls and process communication lines to them;
  • development of equipment automatic control and monitoring systems;
  • minimum of operation costs and service staff reduction;