Complex projects
Our company has a great experience in solving the tasks of any complication, which can emerge at water supply and sewerage plants.
Cooperation with us – is all-in-one:
- Design;
- Construction;
- Equipment manufacture and delivery;
- Mounting and contract supervision;
- Starting up works;
- Warranty and post-warranty service.
Some plants where the complex of “design-starting up” works was accomplished.
| Plant | Dispatch list
| Terms of accomplishment
|
Obukhov city "Kiev paperboard plant" PC
|
Design and reconstruction of wastewater sludge mechanical dehydration workshop, reconstruction of biological treatment units |
1998-2006
|
Kharkov city, ”Bezliudovsky” and “Dikanevsky” biological treatment plants, sewerage and water supply systems of the city
|
Reconstruction and replacing of process equipment for water treatment plants, rehabilitation of the city’s sewerage and water supply systems
|
1999 - 2008
|
Nizhny Novgorod region, Sewerage treatment plants of Gorodets city and of Zavolzhskiy engine industrial enterprise
|
Design and reconstruction of the sludge mechanical dehydration plant, implementation of UV-disinfection devices; reconstruction of biological treatment plants
|
2000 - 2006
|
Moscow region, Sewerage treatment plants of Chernogolovka city
|
Design and reconstruction of sewerage treatment plant (the capacity increased at 1,5 times without construction of additional capacitive structures)
|
2001 - 2008
|
Kiev city, Bortnichi aeration station
|
Reconstruction of biological treatment plants |
2002 - 2008
|
Voronezh city, Sewerage treatment plants “Voronezhsintezkauchuk” PC
|
Design and construction of UV-disinfection device, design and construction of Levoberezhniye sewerage treatment plants, including equipment delivery and mounting
|
2002 - 2008 |
Kishinev city, Sewerage treatment plants
|
Design and reconstruction of biological treatment plants with undertime transfer equipment replacement
|
2003
|
Kaliningrad city, “Concordia” LLC treatment plants (semi-manufactured goods enterprise)
|
Design and construction of local and biological treatment plant (in terms of limited area)
|
2007 - 2008
|
Chernogolovka city, (Moscow region) Reconstruction and extension of the city’s sewerage treatment plants
The main tasks:
- 1,5 times capacity increase of the treatment plants without construction of additional capacitive structures;
- to provide wastewater treatment quality up to the wastes discharge standards of fish industry;
- to replace current manufacturing equipment running at emergency situation.
The main stages of the setting problems implementation:
- Site examination, estimation of capacity of existing plants and accessible treatment results;
- Investigation of the new manufacturing scheme which allows to increase the capacity of STP and provide the required treatment quality;
- Winning the contest on being entitled as the designer of the plant rebuilding construction documents;
- Introduction of several innovations:
- complex of thin mechanical treatment on the basis of the thin treatment screen and aerating sand catcher;
- reequipment of primary tanks to biological treatment anaerobic tanks.
- Winning the contest on being entitled to accomplish constructional and mounting works as the General Contractor;
- The following works has been accomplished: reconstruction of mechanical and biological WWTPs, change of pumping and air-blowing equipment. Domestic manufactured equipment and equipment of the leading world partnership companies was applied for these works.
As a result of the accomplishment of the mentioned tasks we have achieved needed water quality requirements and 1,5 times performance increase of sewerage treatment plant without construction of additional capacitive structures.
Kishinev city Reconstruction of the city’s sewerage treatment plants
The main tasks:
- undertime reconstruction of all the tanks at the non-stop mode applying modern aeration system;
- replacement of airlifts on modern submersible pumps.
The main stages of the setting problems implementation:
- Existing plant examination. As a result of unpredictable earthquake sewerage treatment plants of g. Kishinev were significantly damaged;
- Determination of the EBRD (European Bank for Reconstruction and Development) as the main source of operations financing;
- Implementation of reconstruction designs;
- Supply of the aeration system and pumping equipment; undertime execution of mounting and commissioning.
As a result of the accomplished works the city’s sewerage treatment plants were reconstructed and put into operation.
Nizhny Novgorod region Reconstruction of sewerage treatment plants of the Zavolzhskiy engine industrial enterprise and Gorodets city
The main tasks:
- modern equipment implementation;
- chlorine application refusal;
- sewerage treatment plants flood protection;
- turnkey basis.
The main stages:
- Estimation of received treatment quality;
- Implementation of sewerage treatment plants reconstruction design.
Delivery of modern advanced technology equipment:
- Fine treatment screens;
- Aeration systems;
- Pumping equipment;
- Mechanical dehydration set on the basis of filter-press;
- UV-disinfection device;
- Accomplishment of construction, mounting, balancing and commissioning.
As a result the starting up works of the modern sewerage treatment plants have begun. “Kiev paperboard plant”, Obukhov city (Ukraine)


The main tasks:
- refusal from sludge discharge at the city’s sewerage treatment plant
- sludge beds removal; soil restoration.
The main stages performed by the company for implementation of the setting problems:
- Accomplishment of mechanical dehydration workshop reconstruction design for Tripolsky unit;
- Delivery of the equipment for sludge mechanical dehydration;
- Accomplishment of construction, mounting, balancing and commissioning.
As a result the starting up works of the modern sewerage treatment plants have begun.
|